It looks like the playground equipment at “Meishin Elevated Road No. 4 Park,” “Kumano Park,” and “Kumano Minami Park” in Kumano-cho will all be renovated at the same time.
This article is brought to you by “ALBOBBY,” a salon that supports Nishitsu.

There was a notice posted.
The construction period is listed as 2/15 (Mon) to 3/31 (Wed), but some of the work had already started.
目次
Renovation of “Meishin Elevated Road No. 4 Park”

The monkey bars had been repainted and looked nice and clean.

The horizontal bars were freshly painted too. Please be careful!

The climbing poles had also been repainted.
On this day, the overhead net was being replaced.
Here’s What It Will Look Like After the Renovation

Fitness equipment will be installed: hanging bars, a twist bar, and a jump-touch station.
The four-seat swing set will be renovated, and more tire play equipment will be added.
The horizontal bars, monkey bars, and climbing poles will be repainted (already completed).
Renovation of “Kumano Park” and “Kumano Minami Park”
These two small parks will apparently look like this. ↓


This is Kumano Park.
After the renovation ↓
Sit-up bench and bench installed
Trees pruned

This is Kumano Minami Park.
After the renovation ↓
Toddler slide, seesaw, and monkey bars installed
Here’s the map of the three parks ↓
They are located in Kumano-cho, Nishinomiya City, Hyogo Prefecture.
In Closing
A major renovation for the neighborhood!!
With playground equipment for toddlers and fitness equipment being added, it looks like people of all ages will be able to enjoy these parks😊



















