Platform barriers are coming to Tracks 2 and 3 at Hanshin Koshien Station

This page is automatically translated. Please refer to the original Japanese for accuracy.
しゃちょ美@にしつー
にしつー

At Hanshin Koshien Station, platform barriers have already been installed on Tracks 1 and 4, and it looks like Tracks 2 and 3 are next.
(This information was provided by KAZU@にしつーsp)

Here it is↓

They’ll be installed on the inner platforms: Track 2, for Osaka-Umeda, and Track 3, for Kobe-Sannomiya.

They’re scheduled to be completed in 2026.

The platform doors already installed on Track 1↓

The photo was taken while they were still being installed. They’re already in operation now〜.

Platform doors are being installed at Koshien Station. On Track 1

2024年12月19日

It’s the track area in the middle.

Koshien Station gets huge crowds on game days, so for people who live nearby, this might feel like a bit of a relief in terms of safety.

※ねコすケさん, thank you for the information!!
■■■We’re looking for tips!■■■

西宮市の求人情報

認可保育園の保育士
社会福祉法人和の会 夙川おうち保育園 兵庫県 西宮市
月給22万7,068円~24万8,568円
認可保育園の保育士
株式会社オペレーションナーサリー どんぐりルーム甲子園 兵庫県 西宮市
月給21万5,600円~29万2,200円
Sponsored by 求人ボックス