It looks like the swings at Katahoko Park, which surrounds Katahoko Pond along the Shukugawa River, are being replaced.
This article is brought to you by “ALBOBBY,” a salon that supports Nishitsu.

It looks like there will be three swings in a row.

Construction is scheduled to continue until March 31, 2021.
By the way, this is what the old swings looked like↓↓

There used to be four swings in a row.

They’re covered with plastic, but it looks like one of them will be shaped like an aerial swing you’d see at an amusement park.
A swing that even little kids can ride safely😀
From April, it’ll be nice to have shiny new swings.












