Major construction work is underway around Mukogawa Station.
A large piece of land has appeared over the river.
It looks like about 70% of the river has been filled in.
The Mukogawa Bon Odori dance venue is gone too.
It’s actually part of river improvement work on the Mukogawa being carried out by Hyogo Prefecture.
It looks like the work will be finished by May, so it should be done in time for the Mukogawa Bon Odori.
Finally
The work seems to be aimed at making the river strong enough to withstand a major flood like the one that occurred on the Mukogawa in June 1961. Because it’s such a large river, flood control is important.
盆踊り、今年はどうする?





















